Freezing method - List of Manufacturers, Suppliers, Companies and Products

Freezing method Product List

1~10 item / All 10 items

Displayed results

Piping construction "Freezing method (building)" continuous water freezing method 'Freezing method (building)'

A construction method that allows for the replacement and expansion of piping branches and valves with minimal water drainage!

The "freezing method (for buildings)" is a technique that uses liquid air (nitrogen) to freeze the water inside pipes, allowing for branch pipe and valve replacement work, as well as expansion work, with minimal water drainage. The frozen section acts as a stop valve, enabling plumbing work to be carried out without shutting off the water supply to the entire building. 【Features】 ■ The frozen section can temporarily serve as a substitute for a valve, leaving nothing on the piping. ■ It reduces the time required for water outage work. *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Piping Equipment
  • Drainage and water removal

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Plumbing Work "Continuous Water Freezing Method (Building)" Newsletter September 2020

Successful simultaneous multiple freezing at 'important institutions in Japan'! You can also rely on us for continuous, multiple simultaneous, and remote construction.

We would like to introduce the "Newsletter September 2020" issued by Daiyu Freeze Co., Ltd. In this newsletter, we feature our success in simultaneous multiple freezing at "important institutions in Japan," continuous work for seven days at the Tokyo Yaesu underground parking lot, and the freezing methods used at the gateway to the northern sky. Please take a moment to read it. [Contents] ■ Success in simultaneous multiple freezing at "important institutions in Japan" ■ Continuous work for seven days at the Tokyo Yaesu underground parking lot ■ Freezing methods are making a significant impact at the gateway to the northern sky *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Piping Equipment
  • Drainage and water removal

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Construction "Constant Water Freezing Method (Building)" [Daiyuu News] First Issue

Attention to the construction consulting industry "frozen construction method"! Please contact us when you need our services.

We would like to introduce the "Daiyū Newspaper First Issue" published by Daiyū Freeze. This document includes updates on the achievements of the "largest diameter," employee introductions, and information about the "DOWS method," which has expanded the possibilities of continuous water supply. We accept construction requests from all over the country. We also respond on holidays and at night, so please feel free to contact us when needed. [Contents] ■ Updates on the achievements of the "largest diameter" ■ Employee introductions ■ Information about the "DOWS method," which has expanded the possibilities of continuous water supply *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Would you like to experience Daiyuu Freeze's "Freezing Method and Continuous Water Method" firsthand?

Notice of "Construction Method Demonstration"! We have been conducting this for many waterworks departments and contractors.

At Daiyu Freeze Co., Ltd., we offer demonstrations of various non-stop water construction methods, including the freezing method. We will address any questions or concerns you may have, such as "What kind of method is it?", "Is it safe?", and "What are the benefits?". For information on the required time, implementation locations, and actual construction methods, please feel free to contact us. 【Main municipalities where we operate】 ■ Yokohama City ■ Kawasaki City ■ Kashiwa City ■ Saitama City ■ Kawaguchi City ■ Kasukabe City ■ Maebashi City, etc. (Titles omitted) *For more details, please refer to the PDF materials or feel free to contact us.

  • Renovation and repair methods
  • Special Construction Method
  • maintenance

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction to "Frozen Method" for Plumbing Work in Firefighting Equipment Renewal!

Firefighting equipment can be replaced with minimal water drainage! More people are utilizing the "freeze method" during the replacement of the deluge valves due to the revised inspection standards for foam firefighting equipment.

The "freezing method (for buildings)" is a technique that uses liquid air (nitrogen) to freeze the water in pipes, allowing for the replacement of pipe branches and valves, as well as expansion work, with minimal water drainage. The frozen section acts as a stop valve, enabling plumbing work to be carried out without shutting off the water supply to the entire building. Recently, due to the revision of inspection standards for foam fire extinguishing systems, more companies are utilizing this method when replacing open valves. It can also reduce construction time and the cost of chemical disposal, so if you are interested, please feel free to consult with us. 【Features】 ■ Minimal water drainage - Possible to replace even with integrated valves - Reduced construction time ■ Foam extinguishing is also okay with freezing! - Numerous construction achievements using foam extinguishing agents - Reduced chemical and disposal costs ■ Water pressure resistance up to 1.4 MPa *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • Piping Equipment
  • Drainage and water removal

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Freezing Method "ICELOCK"

No generation of industrial waste without contaminating soil or groundwater! Introducing environmentally friendly construction methods.

"ICELOCK" is a ground improvement method that involves burying freezing pipes underground and freezing the surrounding soil to create a solid frozen ground. Frozen ground can exhibit high ground strength and excellent water impermeability, making it suitable for civil engineering projects, especially in deep depths and under high groundwater pressure. Since no materials are added to the ground to strengthen it, the environmental impact is minimal, and it is considerate of nature. 【Features】 ■ Environmentally friendly ■ High strength ■ Applicable to all soil types ■ Good adhesion with other materials ■ High water impermeability ■ Flexible setting of construction targets *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping construction "Freezing method (building)" continuous water freezing method 'DOWS method'

The basic principle is to combine it with other construction methods! The effectiveness of the combined construction methods increases, leading to a reduction in construction time.

The "DOWS method" is a technique used to assist "freezing methods" and "DSP methods" by temporarily stopping the flow of water (temporary water stopping). This method is not used alone; it is fundamentally combined with other methods. By adopting the "DOWS method," it is possible to avoid complete water stoppage, enhance the effectiveness of the combined methods, and shorten construction time. 【Features】 ■ Freezing is possible without operating existing valves ■ No concerns about damage, leaks, or discolored water due to valve operation ■ When freezing methods are applied at both ends, the area of water stoppage can be minimized ■ Installed at the section of pipe removal, leaving no saddle after construction ■ If the valve does not work and does not freeze with the "freezing method," it is also possible to apply the "DOWS method" later *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Piping Equipment
  • Drainage and water removal

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping construction "Freezing method (building)" continuous water freezing method 'DSP method'

It is possible to carry out the "closure work on the T-shaped pipe for two receivers" without shutting off the main pipe!

The "DSP Method" is a technique used for branching pipes in T-shaped pipes, split T-shaped pipes, and welded piping, where it is difficult to apply freezing methods. When using freezing methods for branching sections, there are conditions and limitations, but with the "DSP Method," valve replacement and shut-off work can be done safely and without worry. 【Features】 ■ Allows construction related to branching sections of piping that are difficult with freezing methods. ■ Enables smooth construction related to branching sections from large-diameter pipes, which was previously challenging. *For more details, please refer to the PDF document or feel free to contact us.

  • Piping Equipment
  • Drainage and water removal
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Piping Work [Construction Example] Buried Water Supply Pipe Branch Extraction Work

To prevent surrounding water outages! We will introduce examples of freeze construction methods related to the installation of hot water pipes.

As a professional in renewal construction, Daiyu Freeze continues to protect the lifelines of the city. We specialize in freeze construction methods. Here, we introduce examples of freeze construction related to buried water supply pipes and branch extraction work. 【Construction Example】 ■ Freeze construction related to buried water supply pipes and branch extraction work 【Construction Description】 ■ Partial water stoppage work using freeze construction due to new branch work of stainless steel pipes (SSP pipes) ■ Mainly used in construction related to new buildings (apartments and single-family homes) to prevent surrounding water outages, employing freeze construction for the work. *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method
  • Piping Equipment
  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Plumbing Work "Continuous Water Freezing Method (Building)" Newsletter November 2019

Introducing new construction achievements with water temperature around 35℃ and 300A! We will continue to accept requests without breaks during the year-end and New Year holidays.

We would like to introduce the "Newsletter November 2019" issued by Daiyu Freeze Co., Ltd. This newsletter features new construction achievements with a water temperature of approximately 35℃300A, the new membership as a supporting member of the Japan Air Service Association, and an increase in personnel with 25 new graduates receiving job offers. Please take a moment to read it. [Contents] ■ New construction achievements with a water temperature of approximately 35℃300A ■ New membership as a supporting member of the Japan Air Service Association ■ Increase in personnel with 25 new graduates receiving job offers *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • Piping Equipment
  • Drainage and water removal

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration